Potential Tripwire #3 When is a load not a load?

Just when we might have hoped for a breather after conquering the mountain that is five-minute settlement in the NEM for Friday 1st October, 2021, we have the wholesale demand response mechanism going live on Sunday 24th of that same month.

we noted a feature of the upcoming EMMS technical specification that we think will impact some users of NEM data, if left unmanaged.

To support advance preparations for the Wholesale Demand Response (WDR) mechanism go-live an updated Electricity Market Management System (EMMS) technical specification was most recently published by AEMO on 4th June 2021 (Figure 1).

An updated Electricity Market Management System (EMMS) technical specification was most recently published by AEMO on 4th June 2021

Figure 1. The updated Electricity Market Management System (EMMS) technical specification

The release of the EMMS Technical Specification and how it fits in to the remaining timeline to go-live (as it relates to the EMMS) is summarised as follows.

 

Timeline of key events Date in 2021 Elapsed time
Draft EMMS Technical specification released for feedback 7 May
1 Month
Updated EMMS Technical specification published (pictured below) 4 June
3 Months
New EMMS Data Model in Preproduction (participant testing commences) 6 September
1 Month
5MS Go-Live 1 October
? Days !
New EMMS Data Model in Production Sometime in October
? Days !
WDR Mechanism Go-Live 24 October

And so, it was recently during Global-Roam’s own preparations for the WDR mechanism that we noted a feature of the upcoming EMMS technical specification that we think will impact some users of NEM data, if left unmanaged.

When a load isn’t a load

The feature we think drives some risk relates to how WDR Units (WDRUs) are identified in the EMMS data model. It is important because offered WDRU energy volumes have opposite meaning to scheduled load energy volumes, so they need to be distinguishable when assessing bids. Aggregating bids or even just understanding whether they represent supply contributions or consumption increases will not be possible without an other source of information.

Figure 2, below, uses the traditional supply-demand relationship graph to demonstrate how offered WDRU energy volumes have opposite meaning to scheduled load energy volumes. Scheduled loads act on the demand side and consume when the price goes below their asking price. Conversely, wholesale demand response units (and generators) act on the supply-side to increase supply when the price goes above their asking price.

Offered WDRU energy volumes have opposite meaning to scheduled load energy volumes.

Figure 2. Offered WDRU energy volumes have opposite meaning to scheduled load energy volumes

 

Traditionally a dispatchable unit’s DISPATCHTYPE in the market data model has delivered the ability to distinguish the role the unit plays in dispatch with the types “GENERATOR” and “LOAD”. In the energy market, loads have traditionally been consumers of energy. The addition of WDRUs assigned to also be ‘LOAD” type (yet act as supply-side contributors) has meant something further needs to be added.

That something further, as per the October 2021 EMMS technical specification, takes the form of an additional column “DISPATCHSUBTYPE” and thereby lets WDRUs assume the DISPATCHTYPE of “LOAD” and the DISPATCHSUBTYPE of “WDR”.

Great! Problem solved: We use the DISPATCHSUBTYPE to distinguish WDRUs from scheduled loads.

But not so fast. We can only use the DISPATCHSUBTYPE column it exists – if we have upgraded our EMMS data models to the new version. If absent, we can only expect to see a mixture of WDRUs and scheduled loads represented as LOAD type.

Figure 3 shows a mocked-up example of what could go wrong in ez2view’s Bids & Offers widget using dummy data for WDRU bids. The example considers what could happen when the dispatch subtype is not available. In the figure we highlight three aspects for consideration:

  1. Without some way of distinguishing scheduled loads from WDRUs we run the risk of only being able to process both types in a single category: “Loads”.
  2. The table to the right, the Bid Stack Merit Order Table, risks including both scheduled loads and WDRUs. We can anticipate that this would be, at the least, misleading as the it does not distinguish whether each row contributes to supply-side or demand-side energy.
  3. The left-side Bid Stack Chart adds the WDRU volumes (140 MW in red and orange colours) to the scheduled load volumes, incorrectly raising the cumulative volume for each stack.

Figure 3. What could go wrong in ez2view’s Bids & Offers widget when dispatch subtype is not available

So, if some data model users aren’t in a position to upgrade their EMMS in October – after it enters production yet before the go-live date – key information needed to distinguish scheduled loads from WDRUs will be missing!

It’s our understanding that the data model and technical specification is now fixed in this regard for October 2021 and the current foreseeable future. Nevertheless, we will keep an eye out for any updates, should they arise.

Reach out to us if you are a client of ours and would like to understand more!

 