Very fast FCAS, 2024 in review
A 2024 review of the trend in the very fast FCAS services captures enablements, availabilities and costs.
A collation of reforms relating to frequency control (including, but not limited to, FCAS)
A 2024 review of the trend in the very fast FCAS services captures enablements, availabilities and costs.
AEMO's Frequency Performance Payments (FPP) project has commenced in production today under "non-financial operation" (NFO).
Semi-scheduled generators shouldn't treat self-forecasts as commercial parameters. The regulator holds significant concerns with the biasing of self-forecasts for commercial benefit.
Six observations from a chart summarising how capacity, availability and volumes enabled have changed over the early phase of the very fast FCAs markets, since commencement on October 9, 2023.
The very fast FCAS markets started on 9 October 2023 and now a Basslink outage presents a confusing situation for required and enabled levels.
The requirement for the very fast raise contingency service is set to increase to 100 MW. We review availability and bids to consider the impact.
The new 1-second FCAS markets have been operational since the 9th October. We take a look to find out how it has fared.
Very Fast FCAS, because it operates at a faster timescale, can arrest the rise or fall in frequency more rapidly than the current fast service and therefore provides an avenue to mitigate the costs of needing to procure increasing levels of the existing fast service....
Thought it would be useful to add in this (belated and back-dated) article with a link to the AEMO status update (from 5th May 2023) on implementation of PFR.
Some brief notes about the publication by the AEMC (on Thu 8th Sept 2022) of the Final Determination with respect to PFR Incentive Arrangements.
The AEMC recently published a draft determination on Primary Frequency Response - proposing it remain mandatory, and to introduce big changes to the causer-pays process, including payments for good performance.
A quick note following AEMC publication of final determination on Fast Frequency Response (FFR).
A quick synopsis of some market reforms at the AEMC relating to system frequency.
One of the many data sets being crunched as part of our analytical efforts underpinning the development of 'GenInsights21' is system frequency. In this short article today, we share some initial observations on how it has been changing.
Just under 3 weeks ago (on 22nd April 2021) the AEMC published a draft determination that would establish 'Fast Frequency Response' as an additional (i.e. 9th and 10th) FCAS service in the NEM. We take a brief look.
Paul McArdle recently drew my attention to a short Twitter thread started by David Osmond on the arcane topic of NEM system frequency behaviour: At Paul’s invitation I’ve dived further into this issue to fill in some background, provide additional data, and comment on...
Our guest author Stephen Sproul looks at how the Dalrymple Battery Energy Storage System (BESS), currently the only source of virtual inertia on the NEM, responded to the November 2019 SA islanding event.
Guest author (and power system control specialist), Kate Summers, looks at what's changed since she published a paper on frequency control in the NEM back in January 2017.
The National Electricity Market (NEM) is designed to operate at 50 Hz. Frequency deviation occurs when generation and load are mismatched. It is important in a lightly meshed and long network such as the NEM to maintain tight frequency control and that frequency response is...