Immediately following these ‘Three questions, in relation to the 3 x NSW batteries directed off for System Strength reasons’, I’ve done a bit more digging (with the help of some tips from a few people … thanks for that).
In this article, I just want to draw your attention to the ‘N-DPTX1-2’ constraint set via these two widgets in ez2view:
This helps to clear up one of my earlier questions.
One question answered…
Via these widgets, we see the following:
1) The ‘N-DPTX1-2’ constraint set:
(a) Which had a scheduled invocation:
i. from the 23:10 (NEM time) dispatch interval on Sunday 5th July 2026
ii. to the 15:45 (NEM time) dispatch interval on Monday 6th July 2026
(b) So this seems to answer my Q1 from the prior article.
2) It also contained ‘zero inverter’ constraint equations covering all three batteries:
(a) Some legacy forms for the *G1 and *B1 permutations (pre IESS)
(b) But with the newer forms being:
i. The ‘N_STR_DPESS_0_I’ constraint equation, for the Darlington Point BESS (DPNTB1)
ii. The ‘N_STR_RESS1_0_I’ constraint equation, for the Riverina 1 BESS (RESS1)
iii. The ’N_STR_RESS2_0_I’ constraint equation, for the Riverina 2 BESS (RIVNB2)
Two question remain … and a new one
So, the above makes it somewhat clearer – but there are some questions that still remain…
Q1) Why did the batteries take so long to come back online after the event?
As noted above, we’ve answered that one, in the scheduled invocation of the ‘N-DPTX1-2’ constraint set!
Q2) Why were they directed (scheduled) off, in the first place?
Now understanding that there was a constraint set that scheduled zero inverters from each of these 3 x units, we have slightly changed Question 2, and added Question 4. Note that:
1) For whatever reason in this article we see that it was these 3 battery units (touted as being able to help with System Strength) that were required to have zero inverters online through the night and well into the next day for ‘system strength’ reasons
2) But (as we saw in this article) the Darlington Point Solar Farm was able to continue running unimpeded. If System Strength was an issue, why not (also) require this one to be off?
I’m probably not alone in being a little confused…
Q3) Has this happened before?
I’ve still not had time to check, but remain curious …
Q4) Why was the direction required?
We now see that the AEMO had the ‘N-DPTX1-2’ constraint set in place to require zero inverters in service in each of those batteries (from the 23:10 (NEM time) dispatch interval on Sunday 5th July 2026 ).
So, given that was already the case, why was MN144415 (published at 23:30:20 on Sunday 5th July 2026) noted the required action for TransGrid that:
‘Disconnect Darlington Point Battery, Riverina 1 Battery, and Riverina 2 Battery from the network at 2327 hrs 05/07/2026’
In other words, did the 3 x batteries not comply with the constraint set?