AEMC published final determination for ‘Primary frequency response incentive arrangements’
Some brief notes about the publication by the AEMC (on Thu 8th Sept 2022) of the Final Determination with respect to PFR Incentive Arrangements.
Read MoreA collation of articles written over time specifically with respect to Primary Frequency Response (PFR) arrangements.
These were re-introduced to DUIDs in the NEM from September 2020 (for Tranche 1), followed by smaller units later. This was in response to a Rule Change made by the AEMC.
Some brief notes about the publication by the AEMC (on Thu 8th Sept 2022) of the Final Determination with respect to PFR Incentive Arrangements.
Read MoreThe AEMC recently published a draft determination on Primary Frequency Response – proposing it remain mandatory, and to introduce big changes to the causer-pays process, including payments for good performance.
A quick synopsis of some market reforms at the AEMC relating to system frequency.
One of the many data sets being crunched as part of our analytical efforts underpinning the development of ‘GenInsights21’ is system frequency. In this short article today, we share some initial observations on how it has been changing.
Paul McArdle recently drew my attention to a short Twitter thread started by David Osmond on the arcane topic of NEM system frequency behaviour: At Paul’s invitation I’ve dived further into this issue to fill in some background, provide…
Guest author (and power system control specialist), Kate Summers, looks at what’s changed since she published a paper on frequency control in the NEM back in January 2017.
The National Electricity Market (NEM) is designed to operate at 50 Hz. Frequency deviation occurs when generation and load are mismatched. It is important in a lightly meshed and long network such as the NEM to maintain tight frequency control and that frequency response is available throughout the network.