2020-09 Primary Frequency Response (PFR)

A collation of articles written over time specifically with respect to Primary Frequency Response (PFR) arrangements.

These were re-introduced to DUIDs in the NEM from September 2020 (for Tranche 1), followed by smaller units later.  This was in response to a Rule Change made by the AEMC.








Incentivising primary frequency response

The implementation of the Primary frequency response incentive arrangements rule is driving change in how system frequency  is controlled and paid-for. The changes stem from how the NEM will incentivise primary frequency response. 6 Years in the making The rule change proposal was initiated July...









Fast Frequency Service – Treating the symptom not the cause?

The National Electricity Market (NEM) is designed to operate at 50 Hz. Frequency deviation occurs when generation and load are mismatched. It is important in a lightly meshed and long network such as the NEM to maintain tight frequency control and that frequency response is...