AEMC published final determination for ‘Primary frequency response incentive arrangements’
Some brief notes about the publication by the AEMC (on Thu 8th Sept 2022) of the Final Determination with respect to PFR Incentive Arrangements.
A collation of reforms relating to frequency control (including, but not limited to, FCAS)
Some brief notes about the publication by the AEMC (on Thu 8th Sept 2022) of the Final Determination with respect to PFR Incentive Arrangements.
A quick note following AEMC publication of final determination on Fast Frequency Response (FFR).
Just under 3 weeks ago (on 22nd April 2021) the AEMC published a draft determination that would establish 'Fast Frequency Response' as an additional (i.e. 9th and 10th) FCAS service in the NEM. We...
Our guest author Stephen Sproul looks at how the Dalrymple Battery Energy Storage System (BESS), currently the only source of virtual inertia on the NEM, responded to the November 2019 SA islanding event.
The National Electricity Market (NEM) is designed to operate at 50 Hz. Frequency deviation occurs when generation and load are mismatched. It is important in a lightly meshed and long network such as the...