Looking back at the South-West NSW RIT-T through a system strength lens
This article from Nadali Mahmoudi and Liam Atkinson from EPEC Group looks at whether the Dinawan–Darlington Point 330kV upgrade, dismissed in 2022, would have delivered greater system strength benefits than what was recognised at the time.
