A first look at the lengthy (double-banger) outage on the Poatina Hydro Station in Tasmania
Following a reader's comment earlier in the week, we take a first look at the major planned outage at Poatina Hydro station.
Following a reader's comment earlier in the week, we take a first look at the major planned outage at Poatina Hydro station.
The greatest difference, pre and post July 2025, is in the flows from Victoria to Tasmania.
The AER has determined the revenue that Basslink can recover for the Basslink transmission cable for the 2026-30 period, operating as a regulated service.
An agreement restraining how Basslink is bid into the energy market has ended, resulting in changes in bidding and energy flows.
A quick record of Tamar Valley CCGT coming offline yesterday (Tue 23rd July 2024) after 40 days of solid operations through a low-rain and low-wind winter in Tasmania.
Prompted by a LinkedIn update by Vedran Kovac (at Hydro Tasmania) we've taken a quick look at the supply mix in Tasmania during the current week.
On Friday 14th October we saw a significant system event in Tasmania - with storms downing power links, leading to large (530MW) loss of load and trip of Basslink. In this article we take a first look at the sequence of events...
Caroline Wykamp and Hydro Tasmania's wholesale team discuss the new 'virtual storage’ electricity swap contract that they have recently brokered with Renewable Energy Hub.