A look at curtailment through the GSD2024
After reviewing the latest version of our Generator Statistical Digest (GSD), David Leitch shares his top insights about VRE curtailment across the NEM in 2024.
After reviewing the latest version of our Generator Statistical Digest (GSD), David Leitch shares his top insights about VRE curtailment across the NEM in 2024.
Drawing from our freshly released GSD2024, Dan provides some deeper insights into curtailment in the NEM, beyond the headline totals that were a topic of much online discussion...
After a suggestion from a reader, Dan plots the locations of the 19 winning CIS projects announced last week against economic and network curtailment data.
In our third guest authored post this week, Blake Ashton from SA Power Networks talks about the SA islanding event that occurred just over twelve months ago -...
With Q2 drawing to a close, we're gearing up to produce GenInsights Quarterly Update for this quarter. Timely to look back at Q1 at what was reported about...
Inspired by the recent article by Tristan Edis (who referenced the GSD2022 in analysis of curtailment of some wind and solar farms), Allan O'Neil follows on with more...