AEMO releases ‘Engineering Roadmap to 100% Renewables’ report
Today the AEMO released a 101-page engineering framework report on the steps required to operate the NEM at 100% instataneous penetrations of renewables.
Today the AEMO released a 101-page engineering framework report on the steps required to operate the NEM at 100% instataneous penetrations of renewables.
A short note about the release, earlier this week, by the AEMO of the ‘Initial Roadmap’ in the NEM Engineering Framework.