It’s come up in conversations a few times since it was published, and is sometimes difficult to find on the AEMO website, so I thought it would be useful to add in this (belated and back-dated) article with a link to the AEMO report ‘Implementation of the National Electricity Amendment (Mandatory Primary Frequency Response) Rule 2020 … Status as at 5 May 2023’ here:
About the Author
Paul McArdle
Related Articles
Paul McArdle Fri 1st November 2024
AEMO publishes an overview of their ‘Minimum System Load procedure’ for Victoria
The AEMO’s publication today (Fri 1st Nov 2024) of their ‘Victorian Minimum System Load Procedure Overview’ 3-page PDF document will be well received.
Paul McArdle Mon 24th March 2025
Two diagrams to help illustrate the changes coming with FPP (Frequency Performance Payments)
We’ve facilitated a number of articles on WattClarity relating to the looming FPP changes (now 10 weeks away). Here’s two images I’ve drawn up to (hopefully) illustrate my understanding of what these changes represent.
Linton Corbet Fri 17th October 2025
Aldoga Solar Farm on Sunday 12th October 2025 – Part 2
In this article we inspect power deviations from dispatched units that would have contributed to the frequency rise, and the deviations that would have contributed to the correction.
Paul McArdle Tue 5th May 2020
Balancing Supply and Demand …. in the fast approaching ‘NEM 2.0’ world
Recent invitations (from COAG Energy Council and AEMO) prompt some further analysis of the data set assembled for the GSD2019 in order to understand more about one of the challenges in balancing Supply and Demand in the NEM 2.0 world.


Be the first to comment on "Status Report from AEMO (as at 5th May 2023) – Implementation of PFR"