Aldoga Solar Farm on Sunday 12th October 2025 – Part 2
In this article we inspect power deviations from dispatched units that would have contributed to the frequency rise, and the deviations that would have contributed to the correction.
In this article we inspect power deviations from dispatched units that would have contributed to the frequency rise, and the deviations that would have contributed to the correction.
Given that we’ve written about that outage several times before, worth noting that Eraring Unit 3 came back online Sunday evening 12th October 2025.
A quick initial look at two lengthy periods of Non-Conformance at Aldoga Solar Farm on Sunday 12th October, with the first period seeing large negative Dispatch Error, and a blip in system frequency.
As something we might refer back to later, here’s a 4-hour trend of NEM Mainland Grid Frequency on Sunday 12th October 2025 – from 09:00 to 13:00 (NEM time).