We’ve already written a number of articles with respect to sequential day operational glitches in April 2026:
- First, the frequency spike (at 10:30) on Friday 10th April 2026; and
- and then the almost identical frequency spike (at 14:20) on Saturday 11th April 2026.
In particular, note ‘A big clue to one causal factor in both frequency spikes (on Friday 10th April 2026 and Saturday 11th April 2026)’:
… and then ‘One image to summarise the sequence of events in the Frequency Spikes of Fri 10th and Sat 11th April 2026’:
So it was not really a surprise (though it’s nice to know) that last Friday 29th May 2026 the AEMO declared both Scheduling Errors (together anointed number 77), with the following description provided:
‘At 10:30 hrs on 10/4/2026, AEMOs Variable Renewable Energy Forecasting System (VREFS) incorrectly produced a 0 MW forecast for multiple semi-scheduled wind farms in Victoria and South Australia. This resulted in these units generating well above dispatch targets of 0 MW, with no semi‑dispatch caps applied. Non-conformance constraints were invoked for Elaine WF, Golden Plains WF East 1, Golden Plains WF East 2, Ryan corner WF.
A similar event occurred at 14:20 hrs on 11/4/2026, VREFS again incorrectly produced a 0 MW forecast for multiple semi-scheduled units. This led to generation exceeding dispatch targets without the application of semi-dispatch caps.’
A big thanks to the WattClarity reader who alerted us to this!



Be the first to comment on "AEMO declares ‘Scheduling Error’ in relation to glitches on Friday 10th April and Saturday 11th April 2026"