‘Speak of the devil’?!
This evening we have noted that ‘AEMO publishes an overview of their ‘Minimum System Load procedure’ for Victoria’.
AEMO forecasts for the coming days …
This afternoon there was a barrage of alerts from ez2view, letting us know of a number of market developments – including three Market Notices relating to forecasts for MSL1 in the coming days…
Sat 2nd November 2024
There already had been forecasts for MSL1 for tomorrow (Saturday 2nd November) – but these were updated via MN119742 at 16:13 as follows:
‘——————————————————————-
MARKET NOTICE
——————————————————————-
From : AEMO
To : NEMITWEB1
Creation Date : 01/11/2024 16:13:32
——————————————————————-
Notice ID : 119742
Notice Type ID : MINIMUM SYSTEM LOAD
Notice Type Description : MSL1/MSL2/MSL3
Issue Date : 01/11/2024
External Reference : Forecast Minimum System Load (MSL1) condition in the VIC region on 02/11/2024
——————————————————————-
Reason :
AEMO ELECTRICITY MARKET NOTICE
Update to Market Notice 119644 – AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the VIC region on 02/11/2024.
Minimum System Load (MSL) conditions are forecast when regional demand is less than the relevant MSL threshold. The advisory MSL thresholds are:
o MSL1 – 1685 MW
o MSL2 – 1185 MW
o MSL3 – 685 MW
The regional demand is forecast to be below the MSL1 threshold for the following period:
From 1030 hrs to 1400 hrs 02/11/2024. Minimum regional demand is forecast to be 1304 MW at 1230 hrs.
Forecast regional demand (DEMAND50) is published in Short Term and Pre-Dispatch PASA region solution reports available on Market Data NEMWEB: https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/data-nem/market-data-nemweb .
AEMO Operations
——————————————————————-
END OF REPORT
——————————————————————-’
Sun 3rd November 2024
There already had been forecasts for MSL1 for Sunday 3rd November – but these were updated via MN119741 at 16:10 as follows:
‘——————————————————————-
MARKET NOTICE
——————————————————————-
From : AEMO
To : NEMITWEB1
Creation Date : 01/11/2024 16:10:05
——————————————————————-
Notice ID : 119741
Notice Type ID : MINIMUM SYSTEM LOAD
Notice Type Description : MSL1/MSL2/MSL3
Issue Date : 01/11/2024
External Reference : Forecast Minimum System Load (MSL1) condition in the VIC region on 03/11/2024
——————————————————————-
Reason :
AEMO ELECTRICITY MARKET NOTICE
AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the VIC region on 03/11/2024.
Minimum System Load (MSL) conditions are forecast when regional demand is less than the relevant MSL threshold. The advisory MSL thresholds are:
o MSL1 – 1795 MW
o MSL2 – 1295 MW
o MSL3 – 795 MW
The regional demand is forecast to be below the MSL1 threshold for the following period:
From 1130 hrs to 1330 hrs 03/11/2024. Minimum regional demand is forecast to be 1684 MW at 1300 hrs.
Forecast regional demand (DEMAND50) is published in Short Term and Pre-Dispatch PASA region solution reports available on Market Data NEMWEB: https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/data-nem/market-data-nemweb .
AEMO Operations
——————————————————————-
END OF REPORT
——————————————————————-’
Tuesday 5th November 2024 (Melbourne Cup Day)
There already had been forecasts for MSL1 for Tuesday 5th November (i.e. Melbourne Cup Day) – but these were updated via MN119743 at 16:14 as follows:
‘——————————————————————-
MARKET NOTICE
——————————————————————-
From : AEMO
To : NEMITWEB1
Creation Date : 01/11/2024 16:14:34
——————————————————————-
Notice ID : 119743
Notice Type ID : MINIMUM SYSTEM LOAD
Notice Type Description : MSL1/MSL2/MSL3
Issue Date : 01/11/2024
External Reference : Forecast Minimum System Load (MSL1) condition in the VIC region on 05/11/2024
——————————————————————-
Reason :
AEMO ELECTRICITY MARKET NOTICE
Update to Market Notice 119682 – AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the VIC region on 05/11/2024.
Minimum System Load (MSL) conditions are forecast when regional demand is less than the relevant MSL threshold. The advisory MSL thresholds are:
o MSL1 – 1535 MW
o MSL2 – 1035 MW
o MSL3 – 535 MW
The regional demand is forecast to be below the MSL1 threshold for the following period:
From 1000 hrs to 1430 hrs 05/11/2024. Minimum regional demand is forecast to be 1106 MW at 1300 hrs.
Forecast regional demand (DEMAND50) is published in Short Term and Pre-Dispatch PASA region solution reports available on Market Data NEMWEB: https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/data-nem/market-data-nemweb .
AEMO Operations
——————————————————————-
END OF REPORT
——————————————————————-’
Basslink back online.
Worth a short note (relevant to the above) that Basslink has returned to service this evening – after the Market Notices were issued, but with the RTS already factored into AEMO’s forecasts for levels of MSL:
This is shown above in a collage of ez2view widgets.
Be the first to comment on "AEMO updates its forecasts for MSL1 in Victoria for coming days …."