Months in the NEM
A month by month view of the history of the NEM.
A month by month view of the history of the NEM.
Collected articles on the notable events of the summer of 2008-2009.
The great bi-annual peak demand forecasting competition. Prove your forecasting prowess and you could win a great seasonal prize!
Reflections on the life of the NEM – where we’ve come from and where we are headed.
A tight supply/demand balance in NSW on the 31st October, exacerbated by transmission constraints into the region led to sustained higher prices in NSW.
As we have the time, we’ll provide some commentary here about the methods used by the various bodies for “long term” (which in the NEM means 10-years, typically) forecasting. Where they don’t fit elsewhere, we’ll also put articles here looking…
A topic containing miscellaneous articles covering aspects of emissions reduction technologies (including renewables) and schemes (including the CPRS, Emissions Trading and the Carbon Tax).
Miscellaneous articles on activity in the NEM during winter 2008.
In March 2008 (after summer had officially ended) South Australians were forced to endure a record 15 straight days of temperatures climbing above 35ºC. Victorians also experienced extreme heat for a number of days. This sweltering weather forced demand through…
Over the period of summer 2006-07, we prepared a number of articles about other occasions of note in the NEM (in addition to the blackout of 16th January 2007, which has been written about separately).
Events of Winter 2002 in the NEM.
Over the period of summer 2005-06, we prepared a number of articles about other occasions of note in the NEM. These articles are linked here.
Summer 2007-08 was really a story of two different summers, with very mild temperatures experienced in the north (resulting in low levels of demand) but with sweltering temperatures in the south (and huge demand as a result). This does not…
Here’s some articles about the impact of the drought on the NEM – culminating in a stepped change in prices, and changes to dispatch patterns, etc…
For two remarkable winter evenings in 2007 (19th and 20th June specifically) NEM-Wide Instantaneous Reserve Plant Margin (IRPM) plunged to the lowest levels ever seen in the NEM (a mere 7.6%) as generators were caught short of capacity by a…