‘V_NWVIC_GFT1_750’ constraint equation

From 10:00 on Tuesday 9th September 2025 a new constraint equation (Constraint ID = ‘V_NWVIC_GFT1_750’) is invoked in the System Normal V-NIL constraint set to deal a larger (i.e. than 600MW) single contingency size of up to a maximum of 1000MW.