Trip of 550MW of industrial load in Tasmania on Friday 12th April 2024
A belated article recording how (on Friday 12th April at 10:48) the Sheffield – Farrell No.2 220 kV line tripped during restoration due to fault on the line, disconnecting ~550MW of major industrial load in Tasmania.