How realistic are those wind capacity factor assumptions in the draft 2026 ISP?
In the draft 2026 ISP, the AEMO materially increased wind capacity factor assumptions for several renewable energy zones. In this article, we compare those assumptions against actual capacity and availability factors for wind units across the NEM in 2025.
