Tasmania’s grid frequency on Friday 12 April 2024
Three data points points help to highlight the change in grid frequency in Tasmania on 12 April 2024.
Three data points points help to highlight the change in grid frequency in Tasmania on 12 April 2024.
A belated article recording how (on Friday 12th April at 10:48) the Sheffield – Farrell No.2 220 kV line tripped during restoration due to fault on the line, disconnecting ~550MW of major industrial load in Tasmania.