LOCL (local limit)

From mid-August 2024 the AEMO increased the transparency of actual (i.e. physical, as distinct from energy-constrained) availability of Semi-Scheduled generators by commencing the publication of two separate, but related, SCADA level data sets they receive from the Wind and Large Solar generators:

(a)  LOCL (local limit)
(b)  ELAV (elements available)

This was noted in the article ‘AEMO commences publishing actual intermittent generators (SCADA) availability data to the EMMS Data Model’.

Here we collate articles tagged with ‘LOCL (local limit)’.