The Non-Scheduled registration category

An explanation of the Non-Scheduled category.

 

(A) Summary of current arrangements

Will add something in here, as time permits.

 

(B) Chronology of evolution

Will add something in here, as time permits.

Date Description
13th December 1998
(Start of the NEM)
At the start of the NEM generators supplying the NEM were registered as Scheduled or Non-Scheduled. The Semi-Scheduled registration category did not exist.
Future? Possible reductions in threshold for registration as a Scheduled generator – as a result of which it will be more difficult for larger plant to remain as Non-Scheduled.

More

(C) Other useful references

On this WattClarity(r) site, any articles tagged with ‘Non-Scheduled’ can be found here.

Will add in other links to useful references as time permits…