AGL’s successful completion of the first two-shifting trial for Bayswater unit 4 (on 7th September 2024)
An update on LinkedIn from Len McLachlan from AGL Energy about a recent trial of two-shifting at Bayswater unit 4 prompts a quick look.
An update on LinkedIn from Len McLachlan from AGL Energy about a recent trial of two-shifting at Bayswater unit 4 prompts a quick look.
The framework we used to analyse the extent to which coal-fired power is “dependable” in the Generator Report Card, and the extent to which it’s been changing.