More network trips in northern NSW, on Friday 7th March 2025 (is TC Alfred involved?)
The AEMO notes that, at 06:12 (NEM time) on Friday 7th March 2025 various 132kV lines between Lismore and Mullumbimby tripped, along with No 1 and 2 cables of Directlink. This follows localised distribution...