~500MW reduced capability to flow south on QNI, as one other factor contributing to NSW volatility on Monday 12th October 2026

Let’s start by noting this ‘framework for exploring what factors were contributing to the volatility in NSW on Monday 12th October 2026’ .

 

That’s one of the articles collated here, with respect to volatility in NSW on Monday afternoon 12th October 2026.  Others in the category:

1)  Many of them speak to various aspects of Supply-Side factors;

2)  Many others speak to various aspects of Demand-Side factors;

3)  This will be the second article speaking directly about Network factors:

(a)  with the first article being the note that there was ‘A brief intermission in service (at PEC Stage 2), from Sunday evening 11th October 2026’.

(b)  in this article, we take an initial look at flow capability south over QNI during Monday afternoon, to help support the rising NSW demand.

(c)  remembering the general principle that ‘An inter-regional interconnector refers to *the whole of* the transmission path between RRNs’.

 

The ‘NSW1-QLD1’ interconnector, a.k.a. QNI

We’ll utilise several widgets in ez2view v9.20, time travelled back to 24:00 at the end of the day Monday 12th October 2026, to see the trend through the day.  Let’s start with this snapshot from the ‘Interconnector Dashboard’ widget focused on QNI:

2026-10-13-at-00-00-ez2view-InterconnectorDashboard-QNI

Briefly:

1)  We’ve highlighted the time period where ‘Import Limit’ on the interconnector (typically flow south into NSW) was restricted by ~500MW compared to before and after;

(a)  beginning ~06:30 (NEM time) and concluding in the 16:10 dispatch interval (NEM time);

(b)  which means that the start of the restriction was well before the price first (substantially) popped in the 14:10 dispatch interval;

(c)  but the 16:10 loosening of restrictions:

i.  coincided with Target Flows increasing southwards

ii.  and spot price dropping in NSW (down from $989.09/MWh at 16:05 to $146.95/MWh at 16:10)

iii.  due to the price moderating effect of the cheaper QLD generation.

2)  We see two constraint sets impacting on the Import Limit:

(a)  Noting the table on the right is focused on the 14:10 dispatch interval (NEM time)

… and that it might have been other factors in other dispatch intervals, though a quick scan suggests not;

(b)  Most importantly, there is the ‘I-QN_500’ constraint set:

i.  which has a description  ‘Qld to NSW on QNI limited to 500 MW, includes constraint with dynamic headroom’

ii. and contains two similar constraint equations:

> the ‘QNI_SOUTH_500_DYN’ constraint equation is the one we see is bound for the 14:10 dispatch interval; but

> also noting the companion ‘QN_500’ constraint equation was bound in other dispatch intervals

(c)  Then there is also the ‘N-ARTW_86’ constraint set:

i.  Which we have seen before a number of times;

ii.  And relates to ‘Out = Armidale to Tamworth (86) line’

iii.  And could result in changes to dispatch (i.e. enablement) of various FCAS commodities … which (via co-optimisation) might change ENERGY dispatch.

We’ll briefly look at each of these…

 

The ‘I-QN_500’ constraint set:

Here’s the ‘Constraint Set Details’ widget, also time-travelled back to 24:00 ending Monday 12th October 2026:

2026-10-13-at-00-00-ez2view-ConstraintSet-IQN500

There’s just the two Constraint Equations in this Constraint Set … top right.

Interestingly, this Constraint Set had not seen usage for ~16 years … since November 2009.  That’s a long time between drinks.

 

The ‘N-ARTW_86’ constraint set:

Here’s the similar view for this constraint set:

2026-10-13-at-00-00-ez2view-ConstraintSet-ARTW86

We see that this one is a much more common participant in the NEMDE dispatch process.


About the Author

Paul McArdle
Paul was one of the founders of Global-Roam in February 2000. He is currently the CEO of the company and the principal author of WattClarity. Writing for WattClarity has become a natural extension of his work in understanding the electricity market, enabling him to lead the team in developing better software for clients. Before co-founding the company, Paul worked as a Mechanical Engineer for the Queensland Electricity Commission in the early 1990s. He also gained international experience in Japan, the United States, Canada, the UK, and Argentina as part of his ES Cornwall Memorial Scholarship.

Be the first to comment on "~500MW reduced capability to flow south on QNI, as one other factor contributing to NSW volatility on Monday 12th October 2026"

Leave a comment

Your email address will not be published.


*