A short article to note simultaneous loss of control on the two x DC interconnectors on the mainland for a couple hours on Saturday morning 15th August 2026. Both Directlink and Murraylink are operated by APA Group, so I wonder what the common factor was behind the simultaneous outage?
| Directlink | Murraylink |
|---|---|
|
At 06:18:42 was MN144803: ‘——————————————————————- From : AEMO ——————————————————————- Notice ID : 144803 ——————————————————————- Reason : AEMO ELECTRICITY MARKET NOTICE Inter-Regional Transfer limit variation – Directlink control unavailable (NSW Region) AEMO has been notified that the controls to vary Directlink output are unavailable until further notice. Constraint set I-CTRL_ISSUE_TE invoked from 0615 hrs. The constraint set contains equations with the following interconnector on the LHS: N-Q-MNSP1 Manager NEM Real Time Operations ——————————————————————- Then at 09:35:24 was MN144804: ‘——————————————————————- From : AEMO ——————————————————————- Notice ID : 144804 ——————————————————————- Reason : AEMO ELECTRICITY MARKET NOTICE Cancellation Inter-Regional Transfer limit variation – Directlink control unavailable (NSW Region). Refer AEMO Electricity Market Notice 144803 AEMO has been notified that the controls to vary Directlink output are now available. Constraint set I-CTRL_ISSUE_TE revoked at 0900 hrs. Manager NEM Real Time Operations ——————————————————————-
|
At 06:18:32 was MN 144802: ‘——————————————————————- From : AEMO ——————————————————————- Notice ID : 144802 ——————————————————————- Reason : AEMO ELECTRICITY MARKET NOTICE Inter-Regional Transfer limit variation – Murraylink control unavailable (SA Region) AEMO has been notified that the controls to vary Murraylink output are unavailable until further notice. Constraint set I-CTRL_ISSUE_ML invoked from 0610 hrs. The constraint set contains equations with the following interconnector on the LHS: V-S-MNSP1 Manager NEM Real Time Operations ——————————————————————- Then at 09:34:54 was MN144805: ‘——————————————————————- From : AEMO ——————————————————————- Notice ID : 144805 ——————————————————————- Reason : AEMO ELECTRICITY MARKET NOTICE Cancellation Inter-Regional Transfer limit variation – Murraylink control unavailable (SA Region) Refer AEMO Electricity Market Notice 144802 AEMO has been notified that the controls to vary Murraylink output are now available. Constraint set I-CTRL_ISSUE_ML revoked at 0900 hrs. Manager NEM Real Time Operations ——————————————————————-
|
Using ez2view to pull up two copies of the ‘Constraint Set’ details widget for each constraint side-by-side, a quick eyeball reveals some some overlap historically between other instances:
Once I started spotting some earlier overlaps, I stopped reading further …

Be the first to comment on "Simultaneous loss of controls on two DC interconnectors (Saturday 15th August 2026)"