Curtailment of rooftop PV underway in South Australia

A short article just to note that curtailment of distributed PV in South Australia is underway on Sunday morning 13th November 2022 as a result of the islanding on Saturday afternoon.  We’ll come along later to explain more in a subsequent article.

Here’s a series of three different Market Notices in reverse chronological order – starting with the MN103087 at 09:15 (NEM time) today:

——————————————————————-
MARKET NOTICE
——————————————————————-

From :              AEMO
To   :              NEMITWEB1
Creation Date :     13/11/2022     09:15:45

——————————————————————-

Notice ID               :         103087
Notice Type ID          :         GENERAL NOTICE
Notice Type Description :         Subjects not covered in specific notices
Issue Date              :         13/11/2022
External Reference      :         Distributed PV Contingency 3 (DPVC3) in the SA Region on 13/11/2022.

——————————————————————-

Reason :

AEMO ELECTRICITY MARKET NOTICE

Distributed PV curtailment is occurring in the SA region to maintain system security due to a Distributed PV Contingency condition.

The instruction to maintain demand above the required threshold is expected to end at 1730 hrs 13/11/2022.

Manager NEM Real Time Operations

——————————————————————-
END OF REPORT
——————————————————————-

Earlier this morning (at 07:36 NEM time with MN103083) the AEMO had warned:

——————————————————————-
MARKET NOTICE
——————————————————————-

From :              AEMO
To   :              NEMITWEB1
Creation Date :     13/11/2022     07:36:41

——————————————————————-

Notice ID               :         103083
Notice Type ID          :         GENERAL NOTICE
Notice Type Description :         Subjects not covered in specific notices
Issue Date              :         13/11/2022
External Reference      :         Distributed PV Contingency 2 (DPVC2) in the SA Region on 13/11/2022.

——————————————————————-

Reason :

AEMO ELECTRICITY MARKET NOTICE

AEMO has taken action(s) to maintain power system security in South Australia at 0730 hrs 13/11/2022 due to a forecast Distributed PV Contingency (DPVC) condition.

AEMO actions may include the recall of planned outages, a direction and/or instruction to scheduled and non-scheduled generation, and/or an instruction to maintain DPV generation below a secure DPV generation threshold.

Manager NEM Real Time Operations

——————————————————————-
END OF REPORT
——————————————————————-

Late last night (at 22:26 with MN103071) the AEMO had warned:

——————————————————————-
MARKET NOTICE
——————————————————————-

From :              AEMO
To   :              NEMITWEB1
Creation Date :     12/11/2022     22:26:48

——————————————————————-

Notice ID               :         103071
Notice Type ID          :         MARKET INTERVENTION
Notice Type Description :         Reserve Contract / Direction / Instruction
Issue Date              :         12/11/2022
External Reference      :         DPV Contingency 1 (DPVC1) in the SA Region on 13/11/2022

——————————————————————-

Reason :

AEMO ELECTRICITY MARKET NOTICE

AEMO has detected there is an elevated risk of the contingent disconnection of Distributed PV (DPV) with the loss of scheduled generation exceeding secure thresholds in the South Australia region from 0830 hrs 13/11/2022 to 1630 hrs 13/11/2022. The maximum forecast DPV contingency is 285 MW at 1230 and the secure DPV contingency threshold is 80 MW.

AEMO is seeking a market response.

An insufficient market response may require AEMO to take action or intervene to maintain power system security in South Australia. This may result in action such as the direction of scheduled generation, curtailment of non-scheduled wind generation, and/or an instruction to maintain DPV generation below a secure DPV generation threshold.

AEMO estimates the latest time at which it may need to intervene through an AEMO intervention event is 0730 hrs on 13/11/2022.

Manager NEM Real Time Operations

——————————————————————-
END OF REPORT
——————————————————————-

For interest sake, I’ve added a snapshot from NEMwatch this morning at the 10:00 dispatch interval with a focus on South Australia, and showing (in the supply mix) only AEMO’s estimate for the amount of rooftop solar being injected into the SA region:

2022-11-13-at-10-00-NEMwatch-SA

More to come later, in subsequent articles…


About the Author

Paul McArdle
One of three founders of Global-Roam back in 2000, Paul has been CEO of the company since that time. As an author on WattClarity, Paul's focus has been to help make the electricity market more understandable.

Leave a comment

Your email address will not be published.


*